Mining Rake winch
【 Capacity 】8kn-27.5kn
【Application】Mining ores or equipment elevate
【Our Services】
- ♦Online visit factory
- ♦ Winch plan design,
- ♦ draw the layout,
- ♦ Factory test before delivery,
- ♦ online video teaching,
- ♦ one year warranty.
- Introduction&Model
what’s a mining electric rake winch :Mining rake winches (hereinafter referred to as winches) are mainly used for ore loading, unloading and filling in metal mines and other pits or open-pit mines. They are used for tilting on slopes that are level or whose inclination angle does not exceed 44°.
Application & Type:
This rake mine winch shall be suitable for use in the following specified physical environment and operating conditions.
1.When the explosion-proof winch is working, the gas and coal dust in the surrounding air should not exceed the concentration specified in the Coal Mine Safety Regulations.
2.Non-explosion-proof winches should not be used in places with flammable and explosive gases such as gas and coal dust.
3.The winch should be installed in an environment where the air temperature is 0℃-40℃, the relative humidity is not more than 85% (when the ambient temperature is 20℃±5℃), the altitude does not exceed 1000m in the engine room, and it should be able to prevent the liquid from dipping into the interior of the appliance, no violent vibration, bumps, and no corrosive gas.
4.When the altitude exceeds 1000m, the air cooling effect and the decrease in dielectric strength need to be taken into account, and the electrical equipment selected should be designed or used according to the agreement between the manufacturer and the user.
Pneumatic Mining Winch
Pulling capacity: 1Ton- 5Ton
Air consumption: 2.3m3-12.7m3
- Installation layout
There are two methods of winch installation, temporary and long-term. Temporary installation can be used to support the top column or add steel ties, long-term installation must be based on concrete. The depth of the foundation depends on the soil condition of the installation, at least 500 mm.
- Technical Specifications
Item | Unit | Model | ||||
2JP-7.5 | 2JP-15 | 2JP-22 | 2JP-30 | |||
Average pulling force | KN | 8 | 14 | 20 | 27.5 | |
Average speed of working steel wire | main steel wire | m/s | 1 | 1.1 | 1.2 | 1.2 |
sub steel wire | 1 | 1.5 | 1.6 | 1.6 | ||
Diameter of steel wire | main steel wire | mm | 9.3 | 12.5 | 14 | 15.5 |
sub steel wire | mm | 9.3 | 11 | 11 | 14 | |
Rope | Diameter | mm | 205 | 225 | 280 | 280 |
Wheel dia | mm | 350 | 435 | 510 | 510 | |
Width | mm | 80 | 125 | 160 | 160 | |
Rope capacity of working drum | Main rope | m | 45 | 80 | 80 | 80 |
Sub Rope | m | 45 | 100 | 100 | 110 | |
Motor power | kw | 7.5 | 15 | 22 | 30 | |
Motor Rotating speed | m/s | 1440 | 1460 | 1470 | 1470 | |
Dimensions | mm | 1210*565*490 | 1525*660*620 | 1600*730*640 | 1650*820*700 | |
Weight(dont including the rake) | KG | ≤390 | ≤660 | ≤900 | ≤1155 |
- Questions before inquiry
Whats the three phase voltage in your country?
Is that applied in coal mines or metal mines?
- Cases
- Contact us now for more details!
Mining Machine
Cases
- High-Quality Mining Support Materials ExportDecember 11, 2024 - 5:51 pm
- Mining Equipment Exporting to OverseasDecember 9, 2024 - 4:25 pm
- 2.5 Ton Battery Electric Locomotives Prepared for Overseas DeliveryNovember 20, 2024 - 5:54 pm
- A batch of mining electric dump trucks sent to overseasSeptember 15, 2024 - 1:52 am
- 10 Ton Trolley Wire Locomotives Loaded for ExportAugust 16, 2024 - 8:14 am
- Export of 10 ton trolley wire locomotivesAugust 2, 2024 - 6:16 am
Contact us
HNYT EQUIPMENT
We could provide live video to show your our factory! Please directly send us the inquiry to our Email or contact us in Whatsapp.
Tel: +86-731-58528855
Mob: +8617773243529
Email: export@ytequipment.net
Add: No. 48, Liancheng avenue, Jiuhua Industrial Park, Jiuhua Economic Zone, Xiangtan City, Hunan, P.R,China